Milk Reception Unit
Filtration, measurement and controlled transfer to the storage line.
Solution Architecture
An integrated line approach for white cheese production from milk reception through brining and packaging, combining hygienic equipment, process flow and automation requirements.
Process Flow
The objective of a white cheese line is to establish repeatable process steps that support product quality. Milk reception, pasteurization, coagulation, curd handling, moulding, pressing, brining and hygiene equipment are positioned as one integrated system.
Main Equipment Used in the Line

Filtration, measurement and controlled transfer to the storage line.

Thermal process design for product safety and line efficiency.

Cutting, draining, transfer and pre-forming process steps.
Capacity Planning Notes
The production target, operating hours and number of batches are evaluated together.
Steam, cooling, drainage, electricity and compressed-air requirements are defined.
CIP connections, mould/crate washing and surface cleanability are planned.
The required level of operator control, recipe management and process monitoring is defined.
Information Required for Quotation
Share your target capacity and plant status so we can define the appropriate equipment and process steps.